Factory prefabricated power shelters, air conditioning shelters, IT shelters and other modules are assembled and constructed on-site in a building-block manner, cutting the construction cycle by 50% compared with the traditional model. With the adoption of technologies such as high-voltage DC power supply and indirect evaporative cooling, the annual average designed PUE can be as low as 1.2x.
Rendering of Lower IT Passage
Rendering of Upper Operation and Maintenance Passage